Measure
₦300kper site / month
For a site under 0.5 MW of IT load. Medium sites (0.5–2 MW) are 2×, large sites 4×. Billed quarterly or yearly; yearly saves a month.
- Upload readings, with checks and quality labels (available)
- Hourly emissions: grid, generator, solar (available)
- PUE for any period (available)
- Dashboards by hour and month (available)
- A printable report and the calculation as CSV (available)
- Every figure traced to its file (available)
- Readings sent automatically from site (available)
- Email alerts when readings stop or the generator runs long (available)